1) Turn on the external power supply
2) Turn on the main power: Turn on the power switch on the main control box and press the chiller switch. The chiller display shows the current water temperature.
3) Press the computer startup switch to enter the marking software system and open the marking software.
4) Wait for the water cooler to run normally for about 30 seconds, turn on the laser power switch, press the operation switch, turn the adjustment knob, and adjust the current to 5A.
5) Press the power switch on the Q starter box to put the Q head into working state. At this time, the power switch indicator is on.
6) Press the power switch of the galvanometer driver on the main control to put the galvanometer into working state and adjust the current to a normal value before marking production.
7) After the marking production is finished, turn off the table start switch and operation switch.
8) Turn off the galvanometer switch of the main control box, and then turn off the Q head driver power switch.
9) Turn the laser current adjustment knob to low to turn off the operation switch and turn off the laser driver power switch.
10) Turn off the red button switch and turn off the chiller after about 30 seconds.
11) Save the produced processing file, exit the compliance software, and close the Windows operating system.
12) Turn off the power switch of the main control box and disconnect the external power supply.





